Filing - EPA Region 10's Excerpts of the Administrative Record
ATTACHMENTS
- Attachment 1 - Att 1: Rationale for a "Threshold of Concern" in Stormwater Release Rates
- Attachment 2 - Excerpts from Chambers-Clover Creek Watershed Action Plan
- Attachment 3 - Excerpts from Corrected Final Design Report, Fort Lewis Stormwater Improvement Outfalls
- Attachment 4 - Forest Cover, Impervious Surface Area and the Mitigation of Stormwater Impacts
- Attachment 5 - Fort Lewis NPDES Permit Application
- Attachment 6 - Excerpts from Chambers-Clover Creek Management Plan
- Attachment 7 - 2004 MS4 Annual Report, Fort Lewis
- Attachment 8 - Excerpts from Clover Creek Basin Plan
- Attachment 9 - Excerpts from Muck Creek Basin Plan
- Attachment 10 - Excerpts from National Management Measures to Control Nonpoint Source Pollution
- Attachment 11 - EPA Summary of Services' Comments on Ecology's MS4 Permits
- Attachment 12 - Letter from Services to Ecology re MS4 permits
- Attachment 13 - Excerpts from Fundamentals of Urban Runoff Management
- Attachment 14 - 2007 Western WA Phase II Permit
- Attachment 15 - 2007 Phase I MS4 Permit
- Attachment 16 - Att 16a: Excerpts from Murray/Sequalitchew Watershed Management Plan
- Attachment 17 - Att 16b: Excerpts from Murray/Sequalitchew Watershed Management Plan
- Attachment 18 - Att 16c: Excerpts from Murray/Sequalitchew Watershed Management Plan
- Attachment 19 - Att 16d: Excerpts from Murray/Sequalitchew Watershed Management Plan
- Attachment 20 - Att 16e: Excerpts from Murray/Sequalitchew Watershed Management Plan
- Attachment 21 - Att 16f: Excerpts from Murray/Sequalitchew Watershed Management Plan
- Attachment 22 - Att 17: Report to West Virginia Dept of Envt Protection
- Attachment 23 - Att 18: Excerpts from Managing Stormwater in Your Community
- Attachment 24 - Att 19: PCHB Phase I Order
- Attachment 25 - Att 20: Excerpts from Urban Stormwater Management in the US
- Attachment 26 - Att 21: Managing Wet Weather with Green Infrastructure
- Attachment 27 - Att 22: Puget Sound Action Agenda
- Attachment 28 - Att 23: Building Soil
- Attachment 29 - Att 24: Linking Hydrologic Alteration to Biological Impairment
- Attachment 30 - Att 25: Outfall 004 Design Narrative
- Attachment 31 - Att 26: Outfall 004 Hydrologic Report
- Attachment 32 - Att 27: Anchorage MS4 Permit
- Attachment 33 - Att 28: Development of LID Standards
- Attachment 34 - Att 29: Jan 2010 DoD EISA Memo
- Attachment 35 - Att 30: Excerpts from MS4 Permit Improvement Guide
- Attachment 36 - Att 31: FAQs Implementing the Flow Control Standard
- Attachment 37 - Att 32: Development of LID Standards for MS4 GPs
- Attachment 38 - Att 33: June 10, 2010 Meeting Agenda with Notes
- Attachment 39 - Att 34: Email message from Ecology to EPA re Ecology comments on draft permit
- Attachment 40 - Att 35: Proposed Requirements and Timelines to Incorporate LID
- Attachment 41 - Att 36: Green Infrastructure and Storm Depth Retention Criteria
- Attachment 42 - Att 37: Letter from JBLM to EPA re revised permit application
- Attachment 43 - Att 38: Task 1 Urban Stormwater Runoff
- Attachment 44 - Att 39: Oct 2010 Army Memo
- Attachment 45 - Att 40: Letter from RA to Ecology re Western WA MS4 Permits
- Attachment 46 - Att 41: Stormwater Compliance for AFBs
- Attachment 47 - Att 42: Setting Targets for Puget Sound Recovery
- Attachment 48 - Att 43: 2008-2010 Progress Report
- Attachment 49 - Att 44: Email from EP to JBLM re EPA's preliminary draft permit
- Attachment 50 - Att 45: Letter from Ecology to EPA re revised preliminary draft permit and fact sheet
- Attachment 51 - Att 46: EPA notes from July 19, 2011 meeting with JBLM
- Attachment 52 - Att 47: Puget Sound Ecosystem Recovery Targets
- Attachment 53 - Att 48: Email from JBLM to EPA dated August 26, 2011
- Attachment 54 - Att 49: DC MS4 Permit
- Attachment 55 - Att 50: Email from JBLM to EPA re comments on preliminary draft fact sheet
- Attachment 56 - Att 51: Email from JBLM to EPA dated November 18, 2011
- Attachment 57 - Att 52: Letter from EPA to Ecology requesting preliminary certification
- Attachment 58 - Att 54: Public Notice of JBLM Permit
- Attachment 59 - Att 53: Draft 401 Certification
- Attachment 60 - Att 55: Draft JBLM MS4 Permit
- Attachment 61 - Att 56: JBLM MS4 Permit Fact Sheet
- Attachment 62 - Att 57: Letter from EPA to Ecology re Comments on Ecology's MS4 Permits
- Attachment 63 - Att 58: Ecology's Listserve notification
- Attachment 64 - Att 59: EPA Agenda and Public Meeting Sign-In Sheet
- Attachment 65 - Att 60: Public Meeting Presentation
- Attachment 66 - Att 61: FWS Comment Letter
- Attachment 67 - Att 62: DoD Comment Letter
- Attachment 68 - Att 63: JBLM Comment Letter
- Attachment 69 - Att 64: Excerpts from Western WA Stormwater Manual, Volume 1
- Attachment 70 - Att 65: Western WA Stormwater Manual, Vol. 3
- Attachment 71 - Att 66: Western WA Stormwater Manual, Vol. 4
- Attachment 72 - Att 67: Western WA Stormwater Manual, Vol 5
- Attachment 73 - Att 68: 2012 Phase II Western WA Permit
- Attachment 74 - Att 69: 2012 Phase I MS4 Permit
- Attachment 75 - Att 70: Ecology RTC re Western WA Phase II Permit
- Attachment 76 - Att 71: Excerpts from Ecology's RTC re MS4 Permits
- Attachment 77 - Att 72: Ecology RTC re Appendix 1 and LID for MS4 Permits
- Attachment 78 - Att 73: Ecology RTC re Phase I Permit
- Attachment 79 - Att 74: JBLM Impervious Analysis
- Attachment 80 - Att 75: JBLM Canopy Analysis
- Attachment 81 - Att 76: Email from Ecology to EPA re waiver for flow control
- Attachment 82 - Att 77: Boise MS4 Permit
- Attachment 83 - Att 78: JBLM Biological Evaluation
- Attachment 84 - Att 79: Stormwater Technical Meeting between EPA & Svcs
- Attachment 85 - Att 80: Letter from JBLM to EPA re SW Treatment Facility for Outfall 4
- Attachment 86 - Att 81: Letter from EPA to Ecology requesting final certification
- Attachment 87 - Att 82: FWS Concurrence Letter
- Attachment 88 - Att 83: NMFS Concurrence Letter
- Attachment 89 - Att 84: Final 401 Certification
- Attachment 90 - Att 85: Agenda and Notes from meeting between EPA & JBLM on Aug. 8, 2013
- Attachment 91 - Att 86: JBLM Response to Comments
- Attachment 92 - Att 87: Final JBLM Permit
- Attachment 93 - Att 88: Letter from EPA to NMFS transmitting final permit
- Attachment 94 - Att 89: Letter from EPA to FWS transmitting final permit
- Attachment 95 - Att 90: EISA Technical Guidance
Link to Filing (PDF. pages)
EAB Appeal Number(s): NPDES 13-09
Filing Number: 21
Filing Date: 01/15/2014
Case Name: Joint Base Lewis-McChord Municipal Separate Storm Sewer System
The documents provided by the Board are Adobe Acrobat PDF ( Portable Document Format). They can be viewed, and printed, with the use of an Adobe Acrobat Reader. The Adobe Acrobat Reader is available, free, for Unix, Macintosh, IBM DOS, and IBM Windows operating systems. Download the latest version of Adobe Acrobat Reader from Adobe's Web site. Adobe also offers accessibility tools to enable the conversion of PDF to html.